Sma 20000TL Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Ekwipunek Sma 20000TL. SMA 20000TL User Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj

Podsumowanie treści

Strona 1 - OperatingManual

OperatingManualSUNNYTRIPOWER20000TL/ 25000TLSTP20-25TL-BE-en-12 | Version 1.2ENGLISH

Strona 2 - Legal Provisions

3 Scope of DeliveryCheck the scope of delivery for completeness and any externally visible damage. Contact yourdistributor if the scope of delivery is

Strona 3 - Table of Contents

4 Product Description4.1 SunnyTripowerThe SunnyTripower is a transformerless PV inverter with two MPP trackers which converts the directcurrent of t

Strona 4

Position DesignationF DC load-break switchThe inverter is equipped with a DC load-break switch. If the DC load-break switch is set to the position I,

Strona 5 - 1.3 Additional Information

Symbol ExplanationThe product does not have a transformer.Three-phase alternating current with neutral conductorWEEE designationDo not dispose of the

Strona 6 - 1.4 Symbols

LED Status ExplanationRed LED glowing ErrorAn error has occurred. The error must be rectified by aqualified person (for troubleshooting, see the servi

Strona 7 - 1.5 Nomenclature

Multifunction RelayYou can configure the multifunction relay for various operating modes. The multifunction relay isused, for example, to switch fault

Strona 8 - 2 Safety

5 Mounting5.1 Requirements for MountingRequirements for the mounting location:Danger to life due to fire or explosionDespite careful construction, ele

Strona 9

Dimensions for mounting:638 mm432 mm216 mm 216 mm20 mm 11 mm79 mm Ø 11 mm112 mm105 mm110 mm86 mm130 mm 86 mm467 mm619 mm40 mm130 mm648 mm507 mmFigure

Strona 10 - 3 Scope of Delivery

1382 mm2224 mm530 mm50 mm400 mm190 mm315 mm415 mm438 mm415 mm940 mmFigure 4: Recommended clearancesPermitted and prohibited mounting positions:☐ The i

Strona 11 - 4 Product Description

☐ For transporting the inverter with a crane: two eye bolts suitable for the weight of the inverter(size: M10)☐ To secure the inverter from being lift

Strona 12 - SMA Solar Technology AG

Legal ProvisionsThe information contained in these documents is property of SMA Solar Technology AG. Anypublication, whether in whole or in part, requ

Strona 13 - 4.2 LED Signals

2. Align the wall mounting bracket horizontally on the wall and use it to mark the position of thedrill holes. Use at least one hole on the right-hand

Strona 14 - 4.3 Interfaces and Functions

11. In order to secure the inverter from being liftedoff the wall accidentally, attach it to the wall withsuitable mounting material. Use both of thel

Strona 15 - Surge arrester type II

6 Electrical Connection6.1 Safety during Electrical ConnectionDanger to life due to high voltages of the PV arrayWhen exposed to sunlight, the PV arra

Strona 16 - 5 Mounting

6.2 Overview of the Connection Area6.2.1 View from BelowABCD EFGFigure 6: Enclosure openings at the bottom of the inverterPosition DesignationA Pin co

Strona 17 - Dimensions for mounting:

6.2.2 Interior ViewFigure 7: Connection areas in the interior of the inverterPosition DesignationA DC protective coverB Pin connector for connecting t

Strona 18 - 5.2 Mounting the Inverter

☐ Insulation stripping length: 12 mm☐ The cable must be dimensioned in accordance with the local and national directives for thedimensioning of cables

Strona 19

Additional grounding:Safety in accordance with IEC62109The inverter is not equipped with a grounding conductor monitoring device. In order toguarante

Strona 20

4. Insert the cable gland from the outside into theenclosure opening and tighten it from the insidewith the counter nut.5. Route the AC cable into the

Strona 21

6.3.3 Connecting Additional GroundingIf additional grounding or equipotential bonding is required locally, you can connect additionalgrounding to the

Strona 22 - 6 Electrical Connection

☐ All PV modules must be aligned and tilted identically.☐ On the coldest day based on statistical records, the open-circuit voltage of the PV array mu

Strona 23 - 6.2.1 View from Below

Table of Contents1 Information on this Document ... 51.1 Validity...

Strona 24 - 6.3 AC Connection

Procedure:1. Ensure that the circuit breaker is switched off from all three line conductors and that it cannotbe reconnected.2. Ensure that there is n

Strona 25

6.Damage to the inverter due to moisture ingressThe inverter is only properly sealed when all unused DC inputs are closed with DC connectorsand sealin

Strona 26 - Additional grounding:

7 Commissioning7.1 Commissioning ProcedureBefore you can commission the inverter, you must check various settings and make changes ifnecessary. This s

Strona 27

Country data set for operation with external decoupling protectionWhen operating the PV system with external decoupling protection, the inverter has t

Strona 28 - 6.4 DC Connection

Procedure:1. Make sure that the AC cable is routed so that it cannot be damaged by the partition in thelower enclosure lid.2. Insert the lower enclosu

Strona 29 - 6.4.2 Connecting the PV Array

6. Fasten the two screws using an Allen key (AF3)(torque: 2Nm ± 0.2Nm).7. Turn the DC load-break switch to the position I.8. Switch on the circuit

Strona 30

8 Configuration8.1 Configuration ProcedureOnce you have commissioned the inverter, you may have to adjust various settings via the rotaryswitches in t

Strona 31

8.3 Changing Operating ParametersThis section describes the basic procedure for changing operating parameters. Always changeoperating parameters as de

Strona 32 - 7 Commissioning

☐ The total installed PV power must be known.☐ The active power feed-in specified by the grid operator must be known.Procedure:1. Ensure that the firm

Strona 33

Procedure:• Select the parameter Cycle time of the OptiTrac Global Peak algorithm orMPPShdw.CycTms and set the required time interval. The ideal time

Strona 34

7.1 Commissioning Procedure ... 327.2 Configuring the Country Data Set...

Strona 35

9 Disconnecting the Inverter from Voltage SourcesPrior to performing any work on the inverter, always disconnect it from all voltage sources asdescrib

Strona 36 - 8 Configuration

6. Unscrew the two screws on the DC load-breakswitch using an Allen key (AF3).7. Pull the DC load-break switch down and out ofthe recess.8. Remove al

Strona 37 - System Control Failure

11. Release and remove all DC connectors. Insert aslotted screwdriver or an angled screwdriver(blade width 3.5mm) into one of the slide slotsand pull

Strona 38

10 Technical DataDC InputSTP20000TL-30 STP25000TL-30Maximum DC power at cosφ=1 20,440 W 25,550 WMaximum input voltage 1,000V 1,000VMPP voltage

Strona 39 - Procedure:

STP20000TL-30 STP25000TL-30Total harmonic distortion of the outputcurrent with total harmonic distortionof the AC voltage <2%, and ACpower >

Strona 40

General DataWidth x height x depth, with DC load-breakswitch plugged in661mmx682mmx264mmWeight 61kgLength x width x height of the packaging 78

Strona 41

Grid configurations TN-C, TN-S, TN-C-S, TT (when VN_PE < 20V)National standards and approvals,as per 4/2015*AS4777, ANRE30, BDEW2008,C10/11:201

Strona 42

FansWidth x height x depth 60 mm x 60 mm x 25.4 mmNoise emission, typical ≤29 dB(A)Maximum operating altitude 3,000mAir flow rate ≥ 40m³/hTorquesUpp

Strona 43 - 10 Technical Data

11 AccessoriesYou will find the accessories for your product in the following overview. If required, these can beordered from SMA Solar Technology AG

Strona 44 - Protective Devices

12 ContactIf you have technical problems with our products, please contact the SMAServiceLine. We needthe following information in order to provide

Strona 45 - General Data

1 Information on this Document1.1 ValidityThis document is valid for the following device types:• STP20000TL-30 (SunnyTripower20000TL)• STP25000TL

Strona 46 - Equipment

DanmarkDeutschlandÖsterreichSchweizSMA Solar Technology AGNiestetalSMA Online Service Center:www.SMA.de/ServiceSunny Boy, Sunny Mini Central,SunnyTri

Strona 47 - Data Storage Capacity

13 EC Declaration of Conformitywithin the meaning of the EC directives• 2004/108/EG (Electromagnetic compatibility, EMC)• 2006/95/EG (Low voltage dire

Strona 48 - 11 Accessories

SMA Solar Technologywww.SMA-Solar.com

Strona 49 - 12 Contact

Document title and content Document type"Circuit Breaker"Dimensioning and Selection of a Suitable AC Circuit Breakerfor Inverters under PV-S

Strona 50 - 9:;*<+%,='3)>+%

Symbol ExplanationDesired resultA problem that might occur1.5 NomenclatureComplete designation Designation in this documentSunnyTripower Inverter, pr

Strona 51

2 Safety2.1 Intended UseThe SunnyTripower is a transformerless PV inverter with two MPP trackers which converts the directcurrent of the PV array to

Strona 52 - SMA Solar Technology

Danger to life due to high voltages of the PV arrayWhen exposed to sunlight, the PV array generates dangerous DC voltage which is present in theDC con

Powiązane modele: 25000TL

Komentarze do niniejszej Instrukcji

Brak uwag